1st March 2012 - Global Foundries (Singapore) 

IFE Singapore has been appointed by GLOBALFOUNDRIES to support the new Wafer fab Project in Abu Dhabi, UAE with Engineering Services as part of the Client representing team.

19th July 2010 - Bovis Lend Lease (China) 

IFE Singapore has been appointed by Bovis Lend Lease to provide Engineering services for the FEED development of a new large scale Project in Beijing – China
1st July 2010 - Infineon (Malaysia)

IFE Singapore has been appointed by Infineon – Malaysia, in collaboration with the nominated General Contractor to provide Engineering services for the 210K Expansion Project in Kulim – Malaysia.

15th July 2009 - XFAB (Malaysia)

IFE Singapore has been appointed by XFAB – Malaysia the Design & Construction Management for the Cleanroom upgrading Project in Kuching – Malaysia

21th August 2008 - Infineon (Malaysia)

IFE Malaysia has been appointed by Infineon in Malaysia for the Design and Construction Management related to the new HEI & LTA Project in Kulim - Malaysia.

Sept 07 – April 2008 - Qimonda Fab Asia, Singapore (300 mm)

Design Support, responsible for Space Management design rationalization of the project. Development of Space Management work plans for design engineering tasks include management of the design review meetings. Major task was to ensure that the design engineering team is organized and coordinated with the other key disciplines, and that the designs are developed in accordance with the client’s objective and requirements.

Oct 07 – Feb 2008 - STMicroelectronics, Shenzhen, China (Assembly & Test)

IFE Singapore has been appointed bt STMicroelectronics in Singapore in collaboration with AMA ASSociates to develop the Conceptual Design for the new facility in Singapore. Design Manager, responsible for design rationalization of the project. Development of work plans for design engineering tasks include management of the design review meetings. Major task was to ensure that the design engineering team is organized and coordinated with the other key disciplines and that the designs are developed in accordance with the client's objective and requirements.

July 2007 – Dec 2007 - Chartered Semiconductor, FAB 7C, Singapore (300 mm)

Design Manager, responsible for the development and refinement of the detailed design of the CSM FAB 7C Extension - Project. During the various design refinements the engineering tasks are developed in accordance with the client’s objective and requirements.

 
13th November 2007 - IFE Malaysia

IFE Malaysia has been appointed by Confidential Client in Malaysia the Construction Management for the new LED facility in Penang.

18th October 2007 - IFE Singapore

IFE Singapore has been appointed by VCAPS in Singapore in collaboration with AMA Associates to develop the Conceptual Design for the new facility in Vietnam. Design Manager, responsible for design rationalization of the project. Development of work plans for design engineering tasks include management of the design review meetings. Major tasks was to ensure that the design engineering team is organized and coordinated with the other key disciplines and that the designs are developed in accordances with the client's objective and requirements.

Qimonda Global Module House, Johor Malaysia (Assembly & Test)

Design Support, responsible for Space Management design rationalization of the project. Development of Space Management work plans for design engineering tasks include management of the design review meetings. Major task was to ensure that the design engineering team is organized and coordinated with the other key disciplines, and that the designs are developed in accordance with the client’s objective and requirements.

 
14th June 2007 - IFE Singapore

IFE Singapore in collaboration with Siegle & Epple has been appointed by Confidential Client in Malaysia the Conceptual Design development for the new LED facility in Penang.

Dec 2006 – June 2007 - Infineon Technology, Power Fab Phase 2, Kulim, Malaysia (300 mm)*

Design Manager, responsible for the development and refinement of the detailed design of the Power Fab Phase 2 - Project. During the various design refinements the engineering tasks are developed in accordance with the client’s objective and requirements.

 

Confidential Clients (200 / 300 mm)*

Design Development Manager, responsible for the development and refinement of Concept studies for several Projects in Asia.

 
July 2005 - Dec 2006 - Confidential Client Kiriat Gat – Israel (300 mm)*

Design Manager, responsible for the Design development from Programming, Conceptual Design and Preliminary Design through, the Detailed Design phase for the Wafer Fab Project in Israel.

The Wafer Fab Project represents today, one of the most modern Wafer Fab developments for High Volume Manufacturing. Among the requirement to achieve the critical Project Milestones was the requirement to develop the design deliverables and engineering tasks in accordance with the specific client’s objectives. During the course of the design phase, the maximum head count of the design team totalled at a head count of 128 personnel.

2004 - 2005 - TECH Semiconductor Manufacturing, Fab 1, Retrofit Project, Singapore (200 / 300mm)*

Design Manager, responsible for design rationalization of the project. Development of work plans for design engineering tasks. Management of the project design review meetings, in order to ensure that the design engineering team is organized and coordinated with the other key disciplines, and that the designs are developed in accordance with the client’s objective and requirements.

2004 – 2005 - Infineon Technology, Power Fab, Kulim, Malaysia (300 mm)*

Design Manager, responsible for the design development from Programming, Conceptual Design, Preliminary Design, through to the Detailed Design for the Power Fab Project. During the various design phases the engineering tasks are developed in accordance with the client’s objective and requirements.

2004 - STMicroelectronics, AMK6 Expansion Project, Singapore (200 mm)*

Design Manager, responsible for design rationalization of the project. Development of work plans for design engineering tasks include management of the design review meetings. Major task was to ensure that the design engineering team is organized and coordinated with the other key disciplines, and that the designs are developed in accordance with the client’s objective and requirements.

2004 - JTC Waferfab Park, Singapore (300 mm)*

Design Manager, responsible for the Design Development of the new Waferfab Park Project, project. Close co-operation with Economic Development Board of Singapore (EDB) regarding budgeting and planning, design development, review of design submissions and overall coordination.

2003 – 2004 - Chartered Semiconductor Manufacturing, Fab 7 Modification Project, Singapore (300 mm)*

Design Manager, responsible for design rationalization of the project. Development of work plans for design engineering tasks include management of the design review meetings. Major task was to ensure that the design engineering team is organized and coordinated with the other key disciplines, and that the designs are developed in accordance with the client’s objective and requirements.

 
2003 - Submicron Technology / Confidential Client, Chachoengsao, Thailand (200/300 mm Feasibility Study)*

Design Manager, responsible for the Design Development (Feasibility study) of the Retrofit Waferfab Project (200/300 mm), project budgeting and planning.

2002 – 2003 - Dupont Photomask, Singapore (150 mm)*

Design Manger responsible for the Design Development of the Project. I was also the Project Manager for Cleanroom/HVAC Systems responsible for tendering, evaluation and procurement, project budgeting and planning, design development and review of design submissions for CR systems/HVAC systems as well as the overall coordination, project cost control and pre and post contract administration of the Cleanroom/HVAC Systems.

2002 - Shanghai Belling Corp. Ltd, Shanghai, China (150 / 200mm)*

Design Manager, responsible for tendering, evaluation and procurement, project budgeting and planning, design development and review of design submissions for CR systems/HVAC systems as well as the overall coordination, project cost control and pre and post contract administration of the Cleanroom/HVAC Systems.

2002 - AU-Optronic, Design Shanghai, China (Flat panel, Test & Assembly)*

Design Manager, responsible for tendering, evaluation and procurement, project budgeting and planning, design development and review of design submissions for CR systems/HVAC systems as well as the overall coordination, project cost control and pre and post contract administration of the Cleanroom/HVAC Systems.

2001 - Peregrine Semiconductor Australia, PSA, Australia (150 mm)*

Design Manager, responsible for the design development and review of budgeting and planning.

Project Manager for Cleanroom/HVAC Systems responsible for tendering, evaluation and procurement, project budgeting and planning, design development and review of design submissions for CR systems/HVAC systems as well as the overall coordination, project cost control and pre and post contract administration of the Cleanroom/HVAC Systems.

1999 – 2000 - 1st Silicon Semiconductor Fab, Kuching, Malaysia (200 mm)*

Deputy Design Manager, responsible for the design development. Project Manager for Cleanroom/HVAC Systems responsible for tendering, evaluation and procurement, project budgeting and planning, design development and review of design submissions for CR systems/HVAC systems as well as the overall coordination, project cost control and pre and post contract administration of the Cleanroom/HVAC Systems.

1999 – 2000 Systems on Silicon Manufacturing Co. Pte Ltd (200 mm)*

Design and Construction Management support for all buildings, facilities and process equipment hook-up.

1997 – 1999 Wacker Siltronic (S) Pte Ltd , 200 mm hyper pure silicon wafers*

Design and Construction Management support for all buildings, facilities and process equipment hook-up.

1997 – 1998 - Dupont Photomask, Singapore (150/200 mm)*

Design Manager, responsible for tendering for projects, evaluation and procurement, project budgeting and planning, design development and review of design submissions for CR systems/HVAC systems as well as the overall coordination, project cost control and pre and post contract administration of the Cleanroom/HVAC Systems.

1996 – 1997 - Vanguard Fab 2/3 Project, Hsinchu, Taiwan (300 mm)*

Deputy Design Manager, responsible for the design development. Project Manager for Cleanroom/HVAC Systems, responsible for design development and review of design submissions for CR systems/HVAC systems, as well as the overall coordination.

1995 -1996 - Submicron Technology, Chachoengsao, Thailand (200 mm)*

Project Manager for Cleanroom/HVAC Systems responsible for tendering, evaluation and procurement, project budgeting and planning, design development and review of design submissions for CR systems/HVAC systems as well as the overall coordination, project cost control and pre and post contract administration of the Cleanroom/HVAC Systems.

1995 -1996 - CSM FAB 2 (Cleanroom Extension – Retrofit), Singapore (200 mm)*

Project Engineer for Cleanroom/HVAC Systems responsible for design development and review of design submissions for CR systems/HVAC systems as well as the overall coordination.

 
1995 -1996 - Alpha Memory Bangkok, Thailand (Test & Assembly)*

Project Manager for Cleanroom/HVAC Systems responsible for tendering, evaluation and procurement, project budgeting and planning, design development and review of design submissions for CR systems/HVAC systems as well as the overall coordination, project cost control and pre and post contract administration of the Cleanroom.

 
Note(*) Project references of the key personnel,whereas IFE was not the contracting party.